Tuesday 11 March 2014

11th March 2014 - Electrical Work, Plumbing, Driveway, Water Tank


We have been officially locked out of the house because all electrical work has been completed along with the alarm system which was active and warning us with some warning beeps – so even though we had a window open to climb inside the house but did not want to risk ourselves and changed our mind entering the house.

Took some photos from outside and looked inside the house through the glass windows and found all electrical work was done, Plumbers finished installing everything including bath, toilets etc. front portico piers were also coloured. Concrete work for the driveway was completed this morning which was scheduled later this week, looks like guys were aware of the possible rain in the area and got it done before hand. Also saw 2 big piles of main driveway tiles ready to be installed.

Garage door is due this Thursday along with tiling in the main areas. Mirrors and shower screens are due to be installed next week, carpet is also due next week

















No comments:

Post a Comment