We have been officially locked out of the house because all electrical
work has been completed along with the alarm system which was active and
warning us with some warning beeps – so even though we had a window open to
climb inside the house but did not want to risk ourselves and changed our mind
entering the house.
Took some photos from outside and looked inside the house
through the glass windows and found all electrical work was done, Plumbers
finished installing everything including bath, toilets etc. front portico piers
were also coloured. Concrete work for the driveway was completed this morning
which was scheduled later this week, looks like guys were aware of the possible
rain in the area and got it done before hand. Also saw 2 big piles of main
driveway tiles ready to be installed.
Garage door is due this Thursday along with tiling in the
main areas. Mirrors and shower screens are due to be installed next week,
carpet is also due next week